Assessing the Factors Causing Project Completion Delays in the Construction Sector of Oman Using Sem-Pls

  • Save

... pages left unread,continue reading

Document pages: 13 pages

Abstract: Purpose: The objectives of the study were to investigate the causes of the delays to analyze the factors causing the construction delay in Oman and to investigate the effects of such delays. Design methodology approach: To carry out this study 210 samples were collected through a well-defined questionnaire from the construction stakeholders viz. the consultants, contractors, and the clients who were selected on a random sampling basis. Smart PLS for Structural Equation Modeling (SEM) technique was used to analyze the data to obtain the formative measurement models, the structured model, and the goodness of fit. Findings: The results of the study reveal that the client-related factors, equipment-related factors, and material related factors have a significant impact on the completion delay in construction projects. The findings of the study also revealed that the Client related factors were – Delay in providing services, Delayed decision-making process, Allocation of insufficient time. Equipment related factors were – Existing low productive equipment, Unskillful Equipment operator, Breakdown of equipment and Outdated equipment; Material related factors were – Delay in supply of raw materials, Non-availability of materials, Change of materials during construction, Non-availability of accessories and Damaged materials. Research limitations Implications: The present study covers the stakeholders of the construction projects from selected regions only. The future studies can be extended to other projects and other regions as well. Social implications: The study suggested that the clients’ cooperation especially in providing the contractors with the necessary equipment, facilities, and sufficient time will avoid such delays of the construction projects in Oman. Originality Value: Only very few have examined the completion delay of the construction projects in Oman using SEMPLS and it is a first-hand study of its kind and the results will be useful to the stakeholders.

Please select stars to rate!

         

0 comments Sign in to leave a comment.

    Data loading, please wait...
×